Champion Bear Announces Drilling Results From Eagle Rock Copper-PGE Project


  • Drill Hole ER19-24 intersected 7.5 m of 0.548 g/t Pd, 0.323 g/t Pt, 0.250 g/t Au with 0.40% Cu from 101.0 m to 108.5 m.
  • Drill Hole ER19-25 intersected 10.0 m of 0.645 g/t Pd, 0.398 g/t Pt, 0.325 g/t Au with 0.45% Cu from 75.0 m to 85.0 m. includes three 2 m long intervals with over 0.9 g/t Pd.
  • Drill Hole ER19-28 intersected 34.0 m of 0.465 g/t Pd, 0.281 g/t Pt, 0.201 g/t Au with 0.3% Cu from 97.0 m to 131.0 m. includes four 2 m long intervals with over 0.7 g/t Pd.
  • Drill Hole ER19-29 intersected 56.0 m of 0.488 g/t Pd, 0.272 g/t Pt, 0.188 g/t Au with 0.42% Cu from 46.0 m to 102.0 m. includes six 2 m long intervals with over 0.7 g/t Pd.
  • Drill Hole ER19-30 intersected 8.0 m of 0.511 g/t Pd, 0.306 g/t Pt, 236 g/t Au with 0.42% Cu from 91.0 m to 99.0 m. includes one 2 m long intervals with over 0.8 g/t Pd.
  • 9 new drill holes of which 7 new drill holes had intersections equal to or greater than 0.3 g/t Pd.
  • Total new drilling equal to 1,442 m averaging 160 m per drill hole.
  • The palladium to platinum ratio for most of the intervals range from 1.6:1 to 1.9:1

CALGARY, Alberta, May 28, 2019 (GLOBE NEWSWIRE) -- Champion Bear Resources Ltd. (TSXV: CBA-V) ("Champion Bear" or the "Company") is pleased to announce results from the Q1 2019 Eagle Rock drilling program on its 100% owned project located 60km south of Dryden in NW Ontario.

The results for the 9 NQ diamond drill holes in the Campbell Zone on the Eagle Rock Project are summarized in Table 1 below. The drilling program was designed to collect data predominantly within the top 150 meters of the surface in order to fill historical data gap near surface and complement existing data from 99 drill holes that range as deep as 426m in order to better understand the mineralization distribution.  The 9 holes completed in 2019 are located between existing drill sections of the Campbell Zone and as such do not constitute a material change on the Project.  Table 2 provides details of collar location and hole orientation. A plan view map is attached identifying the Q1 2019 drilling program (Figure 1).

Table 1 – Eagle Rock Copper-PGE Project – Significant Intercepts from 10 Diamond Drill Holes

Hole IDFrom (m)To (m)Length
(m)
Ni (%)Cu (%)Pt (g/t)Pd (g/t)Au (g/t)Co (%)
ER19-2386.3187.150.840.050.300.2450.4290.1780.000
ER19-24101.00108.507.500.050.400.3230.5480.2500.006
Includes102.91104.101.190.090.630.4780.8470.4110.009
 104.10105.801.700.090.650.5110.8870.3970.001
ER19-24114.42119.635.210.030.220.1570.2940.1060.006
ER19-2575.0085.0010.000.060.450.3980.6450.3250.006
Includes77.0079.002.000.090.590.6050.9270.4980.009
 79.0081.002.000.100.800.5800.9510.4600.008
 83.0085.002.000.070.510.6000.9630.4780.007
ER19-2672.0074.002.000.030.110.0830.1920.0460.005
ER19-2782.0098.0016.000.040.230.1300.2380.1130.005
Includes92.0094.002.000.070.460.2960.5140.2410.006
ER19-2897.00131.0034.000.060.340.2810.4650.2010.006
Includes97.0099.002.000.040.300.1520.2580.1160.006
 99.00101.002.000.050.410.1810.3640.1700.006
 101.00103.002.000.020.150.0510.1070.0680.004
 103.00105.002.000.030.160.0700.1090.0580.006
 105.00107.002.000.040.110.0170.0210.0160.006
 107.00109.002.000.090.390.2380.4110.1490.007
 109.00111.002.000.080.370.3430.6020.2290.007
 111.00113.002.000.080.340.4100.6820.1950.007
 113.00115.002.000.100.560.4690.7520.3560.008
 115.00117.002.000.090.480.3780.6530.2970.006
 117.00119.002.000.050.330.3140.5090.2180.005
 119.00121.002.000.050.380.3500.5690.2490.005
 121.00123.002.000.060.490.5010.7910.3910.006
 123.00125.002.000.060.500.4850.8120.3480.006
 125.00127.002.000.060.490.4910.7740.3150.006
 127.00129.002.000.020.160.1550.2230.1050.004
 129.00131.002.000.030.240.1700.2650.1380.004
ER19-28149.00157.008.000.060.480.2870.4910.2150.006
Includes149.00151.002.000.050.480.2830.4920.2110.007
 151.00153.002.000.040.360.1970.3560.1580.005
 153.00155.002.000.050.450.2530.4560.2020.006
 155.00157.002.000.080.610.4160.6600.2890.006
ER19-2946.00102.0056.000.070.420.2720.4880.1880.006
Includes46.0062.0016.000.060.320.1640.2910.1210.005
including46.0048.002.000.070.340.2000.3610.1510.007
 48.0050.002.000.050.250.1180.2140.1020.007
 50.0052.002.000.050.390.1990.3530.1700.007
 52.0054.002.000.050.290.1300.2490.1130.005
 54.0056.002.000.060.300.1520.2590.1000.005
 56.0058.002.000.090.470.2150.3890.1620.006
 58.0060.002.000.080.450.2510.4320.1530.006
 60.0062.002.000.080.460.2440.4240.1880.006
Includes68.0098.0020.000.080.490.3400.5980.2250.006
including68.0070.002.000.060.340.2250.4160.1820.005
 70.0072.002.000.090.580.4590.7830.3350.007
 72.0074.002.000.100.600.4460.8520.3170.008
 74.0076.002.000.080.540.3640.6730.2730.006
 76.0078.002.000.080.590.3780.7370.3050.007
 78.0080.002.000.110.760.5030.9760.3970.008
 80.0082.002.000.070.480.3070.5300.2230.005
 82.0084.002.000.050.330.2060.3550.1520.004
 84.0086.002.000.070.420.2730.4720.1880.006
 86.0088.002.000.080.490.3390.5880.2140.006
 88.0090.002.000.110.680.4510.7800.3090.008
 90.0092.002.000.090.600.4240.7240.2920.007
 92.0094.002.000.070.450.2890.5000.1890.006
 94.0096.002.000.060.420.3000.5260.1870.005
 96.0098.002.000.070.290.3060.5290.1000.006
ER19-3091.0099.008.000.080.420.3060.5110.2360.006
Includes91.0093.002.000.060.410.2670.4820.2160.006
 93.0095.002.000.110.650.4960.8340.3900.007
 95.0097.002.000.090.410.3180.5210.2420.006
 97.0099.002.000.040.190.1440.2080.0970.004
ER19-30133.00141.008.000.050.230.1870.3040.1080.005
Includes133.00135.002.000.070.200.2030.2920.0340.007
 135.00137.002.000.030.130.0950.1720.0850.003
 137.00139.002.000.040.240.1870.3050.1210.005
 139.00141.002.000.060.330.2620.4480.1910.005
ER19-3186.0090.004.000.080.420.1720.3270.1470.005
Includes86.0088.002.000.040.290.1170.2220.0990.004
 88.0090.002.000.120.550.2270.4310.1950.005

Note: Length in Table 1 represents core length not true thickness in meters.  The geometry of the mineralization would indicate the true thickness to be approximately 70 to 80 percent of the core length.

Table 2 – Eagle Rock Project – Collar Locations for Q1 2019 Diamond Drilling

 
Hole ID
Collar location
(UTM NAD 83)
Collar orientation 
NorthingEasting       DipAzimuthEOH depth (m)
ER19-235451045524573-68042102
ER19-245450997524620-57045141
ER19-255450974524671-62045141
ER19-265450954524710-57048129
ER19-275450882524806-55045170
ER19-285450799524963-61045234
ER19-295450853524971-63045189
ER19-305450645525133-58049153
ER19-315450611525204-50045183

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/b7bff8d2-37ab-4310-88da-991443272efd

Sampling consisted of sawing the core in equal halves along the main axis and shipping one of the halves to the Activation Laboratories preparation in Dryden Ontario. The samples are crushed and pulverized before being sent to Activation Laboratories analytical facility in Thunder Bay Ontario for analysis for gold, palladium and platinum by fire assay with ICP finish. All remaining elements were analyzed with an aqua regia digestion and multi-element ICP. Champion Bear uses a comprehensive QA/QC protocol, including the insertion of blanks, standards and pulp duplicates.

Richard Kantor, President of Champion Bear, said the Company was encouraged by these positive results in delineating the mineralization in the Campbell Zone and would be moving forward with further exploration plans to enhance the understanding of the metal distribution on its Eagle Rock properties.

Mr. Todd McCracken, PGeo, Manager-Mining, WSP Canada Inc. is the qualified person ("QP") under the meaning of Canadian National Instrument 43-101 Standards for Disclosure of Mineral Projects, has reviewed and is responsible for the technical content of this news release.

About Champion Bear

Champion Bear is a mineral exploration company focused exclusively on the historically prospective regions of Ontario. The Company's primary targets are platinum group metals, precious metals, and polymetallic base metals deposits. Champion Bear's aim is to create shareholder value through selective property acquisition followed by focused exploration emphasizing drilling. The Company has assembled a large land position in the Dryden and Sudbury areas, totaling over 16,000 hectares. Additional information about Champion Bear can be found on the Company's website at www.championbear.com and on SEDAR at www.sedar.com. For further information, please contact: Richard D. Kantor, Chairman and President of Champion Bear at phone: (403) 229-9522.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION:

This news release includes certain "forward-looking statements" under applicable Canadian securities legislation including statements relating to the results delineating the mineralization in the Campbell Zone and moving forward with further exploration plans to enhance the understanding of the metal distribution on the Company's Eagle Rock properties. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. All statements that address future plans, activities, events, or developments that the Company believes, expects or anticipates will or may occur are forward-looking information, including statements regarding the potential development of resources and drilling plans which may or may not occur. Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the market price of the Company's securities, metal prices, exchange rates, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes, failure of plant, equipment or processes to operate as anticipated, accidents, labour disputes, claims and limitations on insurance coverage and other risks of the mining industry, changes in national and local government regulation of mining operations, and regulations and other matters. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

 

Figure 1