APTIM to Decommission & Dismantle Reactor at Fort Greely


Baton Rouge, La., Oct. 17, 2023 (GLOBE NEWSWIRE) -- Aptim Federal Services, LLC (APTIM), a market leader in decommissioning and environmental solutions, announced today that the U.S. Army Corps of Engineers – Baltimore District has awarded the Company a contract to Decommission and Dismantle the SM-1A Reactor Facility located at Fort Greely, Alaska. In addition to managing the decommissioning and dismantlement of the decades-old reactor, the APTIM-led team will integrate and utilize mature, proven innovations to dispose of both hazardous and radioactive soil and debris from the remote Alaskan installation to the lower-48.

The contract was awarded to APTIM-Amentum Alaska Decommissioning, LLC (A3D), which is a joint venture led by APTIM and Amentum Technical Services, LLC. Other members of A3D’s team include Heritage – M2C1 Joint Venture, a HUBZone small business location in Delta Junction, AK; Lynden Logistics; Brice Environmental; Oak Ridge Technologies; ReNuke Services; AECOM Technical Services; and Delta Junction Medical.

The standalone C-contract has an estimated value of $95.5M, over a 6-year ordering period. The work to be performed under this contract includes planning, permitting, and engineering; site preparation; demolition and disposal of facilities, including components from the deactivated and defueled nuclear reactor, related wells and utility corridors, plus other ancillary facilities. The contract also includes remediation of contaminated soils, a final status survey, and site restoration.

David Lowe, Senior Vice President of APTIM’s Nuclear Decommissioning business unit, said, “APTIM and our heritage companies have a long history of supporting USACE and the Army Reactor Office (ARO) and have managed numerous Decontamination and Decommissioning projects across the federal complex. Our extensive experience performing reactor decommissioning projects for USACE and the ARO enables us to bring advanced innovations and solutions to complete the work safely and effectively at Fort Greely.” Mr. Lowe continued, “We will partner with USACE , regulators, and community stakeholders to eliminate the environmental liabilities of this legacy, aging nuclear facility.”

“We appreciate USACE’s confidence in APTIM and our partners to perform this critical work. We have a tremendous track record of successfully managing high hazard decommissioning work and look forward to bringing innovations and an experienced team to the last standing nuclear reactor constructed as part of the Army Nuclear Power Program (ANPP),” said Steve Moran, APTIM’s Army Reactor Program Manager and the Project Manager for the SM-1A project.

The SM-1A reactor achieved criticality in 1962 and was shut down in March of 1972, followed by the removal and disposition of the spent nuclear fuel in 1973. The primary mission of the single-loop, 20.2 megawatt-thermal pressurized water reactor was to establish a cold-weather nuclear power plant to support power to Fort Greely, with a secondary mission to study the economics of operating a nuclear electric power plant as compared to operating a conventional oil-fired system in a remote location.

An on-site kickoff meeting at Fort Greely will in late October 2023, paving the way for our preparatory work at the site. The team is targeting a full mobilization to the site by mid-2024. Project completion is currently anticipated by 2029. Project information can also be found on the USACE website www.nab.usace.army.mil/SM-1A/.

###

About APTIM

APTIM is a leading professional solutions firm with headquarters in Baton Rouge, Louisiana. We specialize in environmental services, resilience, sustainability, and energy solutions, as well as technical and data solutions, program management, and critical infrastructure. Our dedicated teammates apply their experience and expertise to provide integrated services and solutions for government agencies, commercial and industrial clients, and energy customers. APTIM commits to accelerating the transition toward a clean and efficient energy economy, building a sustainable future for our communities and natural world, and creating a more inclusive and equitable environment that celebrates the diversity of our people. Learn more at APTIM.com and connect with us on Facebook, Instagram, LinkedIn, and Twitter.

About Amentum

Amentum is a leader in global engineering, project management and solutions integration, trusted to modernize the most critical missions anywhere in the world. Driven to create a safer, smarter, cleaner world, we innovate as a team of inventive doers passionate about making a difference. Underpinned by a strong culture of ethics, safety and inclusivity, Amentum is fiercely committed to operational excellence and successful execution. Headquartered in Chantilly, Virginia, we have more than 44,000 employees in 85 countries in all 7 continents. Visit us at amentum.com to learn how we solve what’s next.

Attachment

 
SM‐1A Reactor Facility

Kontaktdaten