Möchten Sie immer auf dem neuesten Stand bleiben?
Erstellen Sie noch heute ein Leserkonto, um die Branchen und Unternehmen zu verfolgen, die Sie interessieren, und passen Sie Ihr Nachrichten-Dashboard an.
-
Bullseye Zone Porphyry Target Highlights: Porphyry mineralization including up to 3.06 g/t Au, 54.9 g/t Ag and 1% Cu combined with porphyry textures and mineralization (including chalcopyrite and...
-
All 24 completed drill holes drilled intersected significant widths of quartz-sulphides veining demonstrating the robust nature of the Surebet Polymetallic Gold-Silver Zone (“Surebet”) that remains...
-
All 23 diamond drill holes completed to date totaling 4,391 meters have intersected significant widths of quartz-sulphides veining along the entire 1,000 meters strike length demonstrating the robust...
-
A third rig has been added to Goliath’s fully funded 2021 maiden drill campaign based on positive assays results from the first three holes and similar looking intercepts containing mineralization and...
-
Assay results from the third hole (GD21-003) intercepted Surebet Zone’s polymetallic quartz-sulphide vein system demonstrate an impressive 35.72 meters* of quartz-sulphide breccia and surrounding...
-
All Seven drill holes completed to date have intersected significant widths of veining and sulphides demonstrating the robust nature of this mineralized system at the Surebet Polymetallic Gold-Silver...
-
The first drill hole from the North pad, GD21-006 (completed @ 195 meters, 060⁰/-62⁰) and intersected 61.5 meters* of quartz-sulphides (galena, pyrrhotite, sphalerite, chalcopyrite) veining,...
-
All five drill holes completed to date have intersected significant widths of veining and sulphides demonstrating the robust nature of this mineralized system at the Surebet Polymetallic Gold-Silver...
-
One hundred percent of the drill holes completed to date have intersected significant widths of veining and sulphides demonstrating the robust nature of this extensive mineralizing Polymetallic...
-
The third drill hole, GD21-003 (165 m, 220°/-70°) intersected 78.0 meters* of quartz-sulphide veining, brecciation and associated alteration from 49.0 to 127.0 meters (link to images);The 53.5 meter*...