Figure 1 – Arakompa Plan Map
K92 Mining Announces Significant Strike Extension to the South at Arakompa and Discovery of Potential Thick High-Grade Zone
22. Oktober 2024 17:00 ET | K92 Mining Inc.
K92 Mining Announces Significant Strike Extension to the South at Arakompa and Discovery of Potential Thick High-grade Zone
Figure 1 – Arakompa Plan Map
K92 Mining Announces Second Set of Drill Results From Maiden Program at Arakompa; Significant Strike Expansion, Delineation of Large Near Surface Bulk Mineralized Zone and Multiple High-Grade Intersections
10. Juni 2024 06:30 ET | K92 Mining Inc.
K92 Announces Second Set of Drill Results from Arakompa Maiden Program; Strike Expansion, Large Bulk Mineralized Zone & High-grade Intersections
Figure 3 - Plan Map
K92 Mining Announces Significant Maiden Drilling Results From Arakompa – Intersecting Multiple High Grade Lodes Including 7.2 M at 24.76 G/T AuEq & 149.4 M at 2.12 G/T AuEq Bulk Intersection Near Surface
21. Februar 2024 06:30 ET | K92 Mining Inc.
K92 Significant Maiden High-grade Drill Results from Arakompa - Multiple High-Grade Lodes Including 7.2 m at 24.76 g/t AuEq and 149 m at 2.12 g/t AuEq