Figure 1 – Location Map of the Judd Vein System, 1235 and 1265 Level, Surrounding Veins and Infrastructure
K92 Mining Announces High Grade Judd 1265 Level Development Results – Total Strike Extension of 211 Metres Averaged 21.69 G/T AuEq at 3.9 Metre J1 Vein Width
27. Oktober 2021 06:30 ET | K92 Mining Inc.
Judd Vein #1 (“J1 Vein”) 1265 Level development encountered significant high-grade mineralization along both the northern and southern extension drives. Since the August 23, 2021 press release, the...
Figure 1 – Location of Near-Mine Vein Targets
K92 Mining Announces Bulk Sample Preliminary Results at Judd Vein System and Commencement of Phase 1 Judd Drill Program
03. September 2020 06:30 ET | K92 Mining Inc.
First significant exploration undertaken on Judd by K92, with approximately 109 metres of 5.5m x 5.5m development completed on Judd #1 Vein, one of four known Judd veins. Based on grade control...