Figure 1
Leviathan Gold identifies multiple targets and advances permitting activities at the Queen’s Birthday project in Victoria, Australia
October 01, 2024 08:30 ET | Leviathan Gold Ltd.
Historic occurrence of over twenty nuggets - each in excess of 10 ounces and attaining up to 2,316 ounces - coincident with interpreted lines of reef suggests an excellent opportunity to discover at...
Figure 1:
Leviathan Gold, via Core Prospecting Pty Ltd. Receives Results, from Phase 2 Diamond Drilling at the Excelsior Prospect
September 10, 2024 08:30 ET | Leviathan Gold Ltd.
A total of 640.85 meters of diamond drilling over 5 holes has been completed by Core Prospecting Pty Ltd.Highlights include 0.41 meters at 6.3 g/t Au in hole EH030 terminated in a void thought to...
Figure 1
Leviathan Gold, via Core Prospecting Pty Ltd. Receives High Grade Assay Results, from Initial Phase of Diamond Drilling at the Excelsior Prospect
June 25, 2024 08:30 ET | Leviathan Gold Ltd.
Highlights include 4.85 meters at 9.0 g/t Au (43.66 gram meters) in hole EH014, 3.13 meters at 56.9 g/t Au (178.23 gram meters), in hole EH017 and 12.68 meters at 9.2 g/t Au, (116.85 gram meters), in...