K92 Mining Announces High Grade Judd 1265 Level Development Results – Total Strike Extension of 211 Metres Averaged 21.69 G/T AuEq at 3.9 Metre J1 Vein Width
October 27, 2021 06:30 ET
|
K92 Mining Inc.
Judd Vein #1 (“J1 Vein”) 1265 Level development encountered significant high-grade mineralization along both the northern and southern extension drives. Since the August 23, 2021 press release, the...
K92 Mining Announces Maiden Judd 1265 Level Development Results – 83 Metre Strike Averaged 16.48 g/t AuEq at 3.5 Metre J1 Vein Width
August 23, 2021 06:30 ET
|
K92 Mining Inc.
The first Judd Vein #1 (“J1 Vein”) 1265 Level development results to date have recorded significant high-grade mineralization, with a strike length of over 83 metres and average vein thickness of 3.5...
K92 Mining Announces Initial Phase 1 High-Grade Judd Vein System Drilling Results, Including 7.25m at 258.01 g/t AuEq
November 09, 2020 06:30 ET
|
K92 Mining Inc.
Results reported for the first four holes of K92’s Phase 1 underground drill program of the sparsely drill tested Judd vein system. Drilling has identified a well-mineralized vein system, intersecting...
K92 Mining Announces Bulk Sample Preliminary Results at Judd Vein System and Commencement of Phase 1 Judd Drill Program
September 03, 2020 06:30 ET
|
K92 Mining Inc.
First significant exploration undertaken on Judd by K92, with approximately 109 metres of 5.5m x 5.5m development completed on Judd #1 Vein, one of four known Judd veins. Based on grade control...