K92 Mining Announces High Grade Judd 1265 Level Development Results – Total Strike Extension of 211 Metres Averaged 21.69 G/T AuEq at 3.9 Metre J1 Vein Width
October 27, 2021 06:30 ET
|
K92 Mining Inc.
Judd Vein #1 (“J1 Vein”) 1265 Level development encountered significant high-grade mineralization along both the northern and southern extension drives. Since the August 23, 2021 press release, the...
K92 Mining Announces High-Grade Judd Vein System Drilling Results, Including 8.51m AT 49.93 g/t AuEq and 3.70m at 53.63 g/t AuEq
August 30, 2021 06:30 ET
|
K92 Mining Inc.
JDD0022 recorded multiple intersections including 8.51 m at 48.56 g/t Au, 47 g/t Ag and 0.54% Cu (49.93 g/t AuEq) on the Judd Vein 1 (“J1”), approximately 50m to the South of the most southern...