Agellis receives an order for 1.3 million SEK from a smelter plant in Norway


Agellis receives an order for 1.3 million SEK from a smelter plant in Norway

AGELLIS Group, which develops and markets products for the global metals
industry, has received an order of 1.3 million SEK to supply a measuring
instrument to a smelter plant in Norway.

The order, which refers to a system for level measurement in furnaces (EMLI-ELP)
is to be used in a research and development furnace. The instrument will be
delivered during the current quarter and installed during the second quarter of
2012.
"This is our second order for an EMLI-ELP instrument from Norway in a short
period of time. It is good to see an Agellis system installed early in the
development of a new furnace and process. This gives us a good opportunity to
promote the EMLI-ELP as the preferred system for new furnace types, as well as
in established furnaces" says Patrik Bloemer, CEO of Agellis.
For competitive reasons, Agellis chooses not to mention the end user plant by
name.

All Agellis products are based on a common electronic platform called EMLI.
EMLI-ELP (Electro Magnetic Level Profiling) measures with high accuracy the
different layers of material in a furnace, such as metal and slag. An accurate
level measurement of the different layers in a furnace is a prerequisite for
higher yield and increased quality of the metal produced.

Patrik Bloemer, CEO, Agellis Group AB, telephone: 46 46-101 363, cell: 46
733-170 843

Pièces jointes