On Friday afternoon, during a routine pressure test of the BOP we found a leak in a control line. To replace the control line the BOP has been pulled and repairs are underway. We expect to be back on full dayrate by the end of this week (approximately 7 days of downtime). There was no leak to the sea and the well is secure.
For further information, please contact:
Scott Kerr, CEO, Sevan Drilling ASA
+47 99283890 mobile
Jon H. Wilmann, CFO, Sevan Drilling ASA
+47 90560406 mobile
About Sevan Drilling:
Sevan Drilling ASA is an international offshore drilling contractor specializing in the ultra deepwater segment. Sevan Drilling ASA is listed on Oslo Børs.