VANCOUVER, British Columbia, Dec. 09, 2020 (GLOBE NEWSWIRE) -- Anfield Energy Inc. (TSX.V: AEC; OTCQB: ANLDF; FRANKFURT: 0AD) (“Anfield” or “the Company”) is pleased to announce that it will conduct a non-brokered private placement for up to 40,000,000 Units at a price of $0.065 per Unit, for a total equity raise of up to $2,600,000 (“the Offering”). Each Unit consists of one common share and one share purchase warrant, with each warrant entitling the holder to purchase an additional common share at a price of $0.10 for a period of twenty-four (24) months. Red Cloud Securities, Inc. is acting as a Finder with respect to the Offering.
The private placement may be closed in tranches. Finders’ fees may be paid in certain circumstances. The foregoing is subject to regulatory approval. All securities to be issued in connection with the private placement will be subject to a four-month-and-one-day statutory hold period in accordance with applicable securities laws.
The proceeds from the private placement will be used for the development of the Newsboy Gold Project, the Charlie Project and other Wyoming-based ISR projects, property-related costs, and general working capital.
About Anfield
Anfield is a uranium and vanadium development and near-term production company that is committed to becoming a top-tier energy-related fuels supplier by creating value through sustainable, efficient growth in its assets. Anfield is also a precious metals development company. Anfield is a publicly-traded corporation listed on the TSX-Venture Exchange (AEC-V), the OTCQB Marketplace (ANLDF) and the Frankfurt Stock Exchange (0AD). Anfield is focused on three asset centres, as summarized below:
The Newsboy Gold Project
The Newsboy Gold Project, located 45 miles northwest of Phoenix, Arizona and 10 miles southeast of Wickenberg in Maricopa County, consists of 2,243 acres of land which is comprised of 35 Federal Lode Claims and 4 State leases.
Between 1987 and 1989, Westmont Mining Company conducted reconnaissance geological mapping, rock chip geochemistry and 102 holes (totaling 7,184 metres) of reverse-core drilling at Newsboy. In 1990, Pima Mining NL drilled 12 diamond core holes (512 metres), 40 reverse core holes (2,000 metres), and completed metallurgical test work, resource and reserve estimates and mine-planning studies.
In 2009, Aurum National Holdings, Ltd. Commissioned North American Environmental Group (NAEG) to produce a report on the Newsboy property which was titled “Technical Report of the Newsboy Gold Property, Maricopa County, Arizona, United States, by Clive R. G. Bailey, dated September 1, 2009.” Anfield considers this a historic report and does not warrant that it meets current NI 43-101 guidance.
Using available data and a cut off grade of 0.02opt Au, NAEG estimated a total in-situ resource of 5.3Mt in the following categories:
- A Measured resource of 2.533Mt at 0.05opt Au and 0.87opt Ag for a total of 127,000oz Au and 2,196,000oz Ag;
- An Indicated resource of 1.076Mt at 0.04opt Au and 0.44opt Ag for a total of 43,000oz Au and 471,000oz Ag; and
- An Inferred resource of 1.719Mt at 0.038opt and 0.45opt Ag for a total of 65,000oz Au and 765,000oz Ag
The NAEG report also identified areas in which the author, based on geologic interpretation, felt the resource could be expanded. The NAEG report also recommended an exploration program for this area. To Anfield’s knowledge these recommendations have not yet been implemented.
Anfield considers these estimates to be historical in nature and cautions that a qualified person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves and Anfield is not treating the historical estimate as current mineral resource or mineral reserves.
Douglas L. Beahm, P.E., P.G. has approved the scientific and technical disclosure, relating to the Newsboy Gold Project, in the news release. He is a Qualified Person as defined in NI 43-101.
Wyoming – Resin Capture and Processing Agreement
Anfield has signed a Resin Capture and Processing Agreement with Uranium One whereby Anfield would process up to 500,000 pounds per annum of its mined material at Uranium One’s Irigaray processing plant in Wyoming.
The Charlie Project, Anfield’s flagship uranium project, is located in the Pumpkin Buttes Uranium District in Johnson County, Wyoming. The Charlie Project consists of a 720-acre Wyoming State uranium lease which has been in development since 1969. A Preliminary Economic Assessment has been completed for the Charlie Project.
Anfield’s 24 remaining ISR mining projects are located in the Black Hills, Powder River Basin, Great Divide Basin, Laramie Basin, Shirley Basin and Wind River Basin areas in Wyoming. Anfield’s three projects in Wyoming for which NI 43-101 resource reports have been completed are Red Rim, Nine Mile Lake and Clarkson Hill.
Arizona/Utah/Colorado – Shootaring Canyon Mill
A key asset in Anfield’s portfolio is the Shootaring Canyon Mill in Garfield County, Utah. The Shootaring Canyon Mill is strategically located within one of the historically most prolific uranium production areas in the United States, and is one of only three licensed uranium mills in the United States.
Anfield’s conventional uranium assets consist of mining claims and state leases in southeastern Utah, Colorado and Arizona, targeting areas where past uranium mining or prospecting occurred. Anfield’s conventional uranium assets include the Velvet-Wood Project, the Frank M Uranium Project, the West Slope Project as well as the Findlay Tank breccia pipe. An NI 43-101 Preliminary Economic Assessment has been completed for the Velvet-Wood Project. The PEA is preliminary in nature, and includes inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment would be realized. All conventional uranium assets are situated within a 200-mile radius of the Shootaring Mill.
On behalf of the Board of Directors
ANFIELD ENERGY INC.
Corey Dias, Chief Executive Officer
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Contact:
Anfield Energy, Inc.
Clive Mostert
Corporate Communications
780-920-5044
contact@anfieldenergy.com
www.anfieldenergy.com
Safe Harbor Statement
THIS NEWS RELEASE CONTAINS “FORWARD-LOOKING STATEMENTS”. STATEMENTS IN THIS NEWS RELEASE THAT ARE NOT PURELY HISTORICAL ARE FORWARD-LOOKING STATEMENTS AND INCLUDE ANY STATEMENTS REGARDING BELIEFS, PLANS, EXPECTATIONS OR INTENTIONS REGARDING THE FUTURE.
EXCEPT FOR THE HISTORICAL INFORMATION PRESENTED HEREIN, MATTERS DISCUSSED IN THIS NEWS RELEASE CONTAIN FORWARD-LOOKING STATEMENTS THAT ARE SUBJECT TO CERTAIN RISKS AND UNCERTAINTIES THAT COULD CAUSE ACTUAL RESULTS TO DIFFER MATERIALLY FROM ANY FUTURE RESULTS, PERFORMANCE OR ACHIEVEMENTS EXPRESSED OR IMPLIED BY SUCH STATEMENTS. STATEMENTS THAT ARE NOT HISTORICAL FACTS, INCLUDING STATEMENTS THAT ARE PRECEDED BY, FOLLOWED BY, OR THAT INCLUDE SUCH WORDS AS “ESTIMATE,” “ANTICIPATE,” “BELIEVE,” “PLAN” OR “EXPECT” OR SIMILAR STATEMENTS ARE FORWARD-LOOKING STATEMENTS. RISKS AND UNCERTAINTIES FOR THE COMPANY INCLUDE, BUT ARE NOT LIMITED TO, THE RISKS ASSOCIATED WITH MINERAL EXPLORATION AND FUNDING AS WELL AS THE RISKS SHOWN IN THE COMPANY’S MOST RECENT ANNUAL AND QUARTERLY REPORTS AND FROM TIME-TO-TIME IN OTHER PUBLICLY AVAILABLE INFORMATION REGARDING THE COMPANY. OTHER RISKS INCLUDE RISKS ASSOCIATED WITH SEEKING THE CAPITAL NECESSARY TO COMPLETE THE PROPOSED TRANSACTION, THE REGULATORY APPROVAL PROCESS, COMPETITIVE COMPANIES, FUTURE CAPITAL REQUIREMENTS AND THE COMPANY’S ABILITY AND LEVEL OF SUPPORT FOR ITS EXPLORATION AND DEVELOPMENT ACTIVITIES. THERE CAN BE NO ASSURANCE THAT THE COMPANY WILL BE ABLE TO COMPLETE THE PROPOSED TRANSACTION, THAT THE COMPANY’S EXPLORATION EFFORTS WILL SUCCEED OR THE COMPANY WILL ULTIMATELY ACHIEVE COMMERCIAL SUCCESS. THESE FORWARD-LOOKING STATEMENTS ARE MADE AS OF THE DATE OF THIS NEWS RELEASE, AND THE COMPANY ASSUMES NO OBLIGATION TO UPDATE THE FORWARD-LOOKING STATEMENTS, OR TO UPDATE THE REASONS WHY ACTUAL RESULTS COULD DIFFER FROM THOSE PROJECTED IN THE FORWARD-LOOKING STATEMENTS. ALTHOUGH THE COMPANY BELIEVES THAT THE BELIEFS, PLANS, EXPECTATIONS AND INTENTIONS CONTAINED IN THIS NEWS RELEASE ARE REASONABLE, THERE CAN BE NO ASSURANCE THOSE BELIEFS, PLANS, EXPECTATIONS OR INTENTIONS WILL PROVE TO BE ACCURATE. INVESTORS SHOULD CONSIDER ALL OF THE INFORMATION SET FORTH HEREIN AND SHOULD ALSO REFER TO THE RISK FACTORS DISCLOSED IN THE COMPANY’S PERIODIC REPORTS FILED FROM TIME-TO-TIME.
THIS NEWS RELEASE HAS BEEN PREPARED BY MANAGEMENT OF THE COMPANY WHO TAKES FULL RESPONSIBILITY FOR ITS CONTENTS.