CALIBRE_LOGO_HORIZONTAL_RGB.png
Calibre Makes a New Discovery Along the VTEM Gold Corridor at the Limon Mine; Drilling at the Past Producing Talavera Mine Hits Additional High-Grades; Drilling Intercepts Include 13.26 g/t Gold Over 4.9 Metres and 4.92 g/t Gold Over 10.3 Metres
10 sept. 2024 06h00 HE | Calibre Mining Corp.
VANCOUVER, British Columbia, Sept. 10, 2024 (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (the “Company” or “Calibre”) is pleased to announce drill results from the Company’s...
CALIBRE_LOGO_HORIZONTAL_RGB.png
Calibre’s Marathon Pit Ore Control Drilling at the Valentine Gold Mine Yields 44% Additional Gold on 47% Higher Grades Than Modelled in the 2022 Mineral Reserve
03 sept. 2024 06h00 HE | Calibre Mining Corp.
VANCOUVER, British Columbia, Sept. 03, 2024 (GLOBE NEWSWIRE) --  Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (the "Company" or "Calibre") is pleased to announce partial ore control reverse...
CALIBRE_LOGO_HORIZONTAL_RGB.png
Calibre Continues to Discover Near Surface, Above Reserve Grade Gold Mineralization at the Pan Mine in Nevada; Drilling Intersects Include 0.45 g/t Gold Over 117.4 Metres and 0.56 g/t Gold Over 59.4 Metres
27 août 2024 06h00 HE | Calibre Mining Corp.
VANCOUVER, British Columbia, Aug. 27, 2024 (GLOBE NEWSWIRE) -- Calibre (TSX: CXB; OTCQX: CXBMF) (“Calibre” or the “Company”) is pleased to announce additional, near surface, resource expansion drill...
CALIBRE_LOGO_HORIZONTAL_RGB.png
Calibre Continues to Intercept High-Grade Gold Mineralization at Its Eastern Borosi Mine Complex; Drilling Intersects Include 13.24 g/t Gold Over 5.8 Metres and 11.62 g/t Gold Over 3.8 Metres
20 août 2024 06h00 HE | Calibre Mining Corp.
VANCOUVER, British Columbia, Aug. 20, 2024 (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (the “Company” or “Calibre”) is pleased to announce drill results from its 2024 resource...
table 1
Calibre Reports Q2, 2024 and Year-To-Date Financial Results and Remains on Track to Deliver into Full Year Production Guidance While the Multi-Million Ounce Valentine Gold Mine Progresses to Construction Completion in Canada
12 août 2024 19h00 HE | Calibre Mining Corp.
VANCOUVER, British Columbia, Aug. 12, 2024 (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (“Calibre” or the “Company”) announces financial and operating results for the three (“Q2...
CALIBRE_LOGO_HORIZONTAL_RGB.png
Calibre Delivers First Ore From the Volcan Open Pit Located 5 Km From the Libertad Mill, Leading to a Stronger H2, 2024
08 août 2024 06h00 HE | Calibre Mining Corp.
VANCOUVER, British Columbia, Aug. 08, 2024 (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (the "Company" or "Calibre") is pleased to announce first ore delivery to the Libertad...
CALIBRE_LOGO_HORIZONTAL_RGB.png
Calibre Announces Receipt of the Federal Environmental Assessment Approval for the Berry Pit at the Valentine Gold Mine, Newfoundland & Labrador, Canada
06 août 2024 06h00 HE | Calibre Mining Corp.
VANCOUVER, British Columbia, Aug. 06, 2024 (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (the "Company" or "Calibre") is pleased to announce that the Honorable Steven Guilbeault,...
CALIBRE_LOGO_HORIZONTAL_RGB.png
Calibre Appoints Sian Tasaka to the Board of Directors
22 juil. 2024 06h00 HE | Calibre Mining Corp.
VANCOUVER, British Columbia, July 22, 2024 (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (the “Company” or “Calibre”) is pleased to announce the appointment of Sian Tasaka to the...
CALIBRE_LOGO_HORIZONTAL_RGB.png
Calibre to Commence an Expanded 100,000 Metre Resource Expansion and Discovery Drill Program Across its Flagship Valentine Gold Mine Property
15 juil. 2024 06h00 HE | Calibre Mining Corp.
VANCOUVER, British Columbia, July 15, 2024 (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (“Calibre” or the “Company”) is pleased to announce a 100,000 metre resource expansion...
Valentine Gold Mine Tailings Management Facility (dam embankment liner at 96% complete)
Calibre Advances Valentine Gold Mine Construction to 73% Complete; Maintains Full-Year Production Guidance
09 juil. 2024 06h00 HE | Calibre Mining Corp.
VANCOUVER, British Columbia, July 09, 2024 (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (the "Company" or "Calibre") is pleased to announce the operating results for the three...