Goliath Drills 59.1 Meters of Continuous Sulphide Mineralization Confirming a Mineralized Footprint of 5.25 Square Kilometers; System Remains Wide Open in All Directions
11 août 2022 07h00 HE
|
Goliath Resources Limited
Drill Highlights: 100% of all holes completed to date on the Surebet discovery have intersected significant zones of sulphide mineralization confirming a mineralized footprint of 5.25 square...
Goliath Adds 5th Drill Rig on Surebet Discovery as 100% of All Holes Intersect Mineralization
28 juil. 2022 07h45 HE
|
Goliath Resources Limited
Surebet Highlights: A 5th rig has been added to Goliath’s fully funded 2022 drill campaign as there is significant mineralization in all holes drilled this year that also look similar to the...
Goliath Drills 360 Meters of Mineralized Breccia From Surface in 1 Kilometer Step Out at Golddigger, Golden Triangle, B.C.
11 juil. 2022 07h45 HE
|
Goliath Resources Limited
Highlights: 100% of the drill holes completed to date on the Surebet discovery have intersected broad zones of significant sulphide mineralization including continuous mineralized breccia from...
Goliath Drills 98.99 Meters* Of Mineralization In 1.5 km Step Out To The West On Pad 15, Golddigger Property, Golden Triangle B.C.
07 juil. 2022 07h45 HE
|
Goliath Resources Limited
Highlights: 100% of the drill holes completed to date on the Surebet discovery have intersected broad zones of significant sulphide mineralization up to 135 meters* wide. The drilling and data...
All Holes Drilled to Date Hit Broad Sulphide Mineralization Up to 135 Meters Wide* at Goliath’s Golddigger Property, Golden Triangle, B.C.
28 juin 2022 07h45 HE
|
Goliath Resources Limited
New Extension Target drill highlights: 100% of all three drill holes completed to date on the New Extension Target at its Golddigger Property have intersected broad zones of significant sulphide...
Goliath Drills Multiple Broad Intervals of Mineralization up to 95.5 Meters in First 2022 Hole on Golddigger, Golden Triangle B.C.
20 juin 2022 07h45 HE
|
Goliath Resources Limited
Initial 2022 drill campaign highlights: The first hole of 2022 (GD-22-25) on Pad J in the New Extension Target has intersected five broad intervals of disseminated and vein/breccia hosted sulphide...
Drilling Underway for 24,000 Meter Program at Goliath’s Extensive New High-Grade Gold-Silver Discovery in the Golden Triangle, B.C.
08 juin 2022 07h45 HE
|
Goliath Resources Limited
Newly Discovered Surebet Zone & New Extension Target Highlights: Fully funded 24,000 meter drilling campaign is underway totaling 85 holes from 24 separate drill pad locations with four diamond...
REPEAT -- Goliath Mobilizes for 24,000 Meter Drill Campaign on Its Extensive High-Grade Gold-Silver Discovery in the Golden Triangle, B.C.
18 mai 2022 11h13 HE
|
Goliath Resources Limited
Newly Discovered Surebet Zone Highlights: Fully funded 24,000 meter drill campaign totaling 85 holes from 24 separate drill pad locations with four diamond drill rigs.The 2022 campaign will include...
Goliath Mobilizes for 24,000 Meter Drill Campaign on Its Extensive High-Grade Gold-Silver Discovery in the Golden Triangle, B.C.
18 mai 2022 01h00 HE
|
Goliath Resources Limited
Newly Discovered Surebet Zone Highlights: Fully funded 24,000 meter drill campaign totaling 85 holes from 24 separate drill pad locations with four diamond drill rigs.The 2022 campaign will include...
Goliath Secures Fourth Drill Rig and Set to Mobilize Shortly for 24,000 Meter Drill Program on Its High-grade Gold-Silver Discovery in the Golden Triangle, B.C.
26 avr. 2022 07h45 HE
|
Goliath Resources Limited
Newly Discovered Surebet Zone Highlights: Fully funded 24,000 meter drill campaign totaling 85 holes from 24 separate drill pad locations with four diamond drill rigs.The 2022 campaign will include...