Figure 1.0
Unigold Identifies NEW, Near Surface, High Grade Mineralization at Candelones Extension
09 mars 2021 06h45 HE | Unigold Inc.
LP20-167 intersected 12.0 meters averaging 5.9 g/t Au and 18.0 g/t Ag in a new zone of mineralization east and stratigraphically above Target A;LP20-167 intersected anomalous disseminated...
Figure 1.0
Unigold Intersects 7.0 meters averaging 21.9 g/t gold and 2.7% copper at Candelones Extension Deposit
02 mars 2021 06h45 HE | Unigold Inc.
LP20-165 intersected 7.0 meters averaging 21.9 g/t Au and 2.7% Cu at Target B;LP20-165 also passed through Target A, intersecting 17.0 meters averaging 6.7 g/t Au and 0.1 % Cu; Low grade...
UGD LOGO.png
Unigold Appoints Mr. Ramón Oscar Tapia Marion Landais as its Country Director in the Dominican Republic
01 mars 2021 06h45 HE | Unigold Inc.
TORONTO, March 01, 2021 (GLOBE NEWSWIRE) -- Unigold Inc. (“Unigold” or the “Company”) (TSX-V:UGD; OTCQX: UGDIF; FSE:UGD1) is pleased to announce the appointment of Sr. Ramón Oscar Tapia Marion...
Figure 1.0
Unigold Provides Update on Engineering and Exploration Programs as Neita advances towards production decision
08 févr. 2021 06h50 HE | Unigold Inc.
PFS engineering on oxide portion of the Candelones deposit is continuing with results expected at the end of Q1Updated Sulphide resource estimate is underway; includes over 35,000m of additional...
Figure 1.0
Unigold Reports 7.0 Meters Averaging 15.06 g/t Au at Target C, Candelones Extension Deposit
10 déc. 2020 06h50 HE | Unigold Inc.
Drilling expands Target C mineralization 75 metres to depth and defines eastern extensionLP20-176 (Target C) intersected 7.0 meters averaging 15.06 g/t Au, 4.4 g/t Ag, 0.45% Cu and 6.33% ZnLP20-178...
UGD LOGO.png
Unigold Reports 13.0 Meters Averaging 5.17 g/t Au at Target C, Candelones Extension Deposit
01 déc. 2020 06h50 HE | Unigold Inc.
Step-out drilling successfully extends Target C a further 75 metres to the east and 75 metres to depth;LP20-170 (Target C) intersected 13.0 meters averaging 5.17 g/t Au, 4.2 g/t Ag, 0.1% Cu and 1.67%...
UGD LOGO.png
Unigold Reports 8.0 Meters Averaging 4.27 g/t at Target B and 17.0 Meters Averaging 2.80 g/t Au at Target C, Candelones Extension Deposit
09 nov. 2020 06h50 HE | Unigold Inc.
Drilling at the eastern targets has not only extended Target B by 40 metres to the east but also intersected the possible extension of Target A in the footwall behind Target BLP20-151 (Target B)...
UGD LOGO.png
Unigold Intersects 14.0 Meters Averaging 14.94 g/t Au at Target C, Candelones Extension Deposit
23 oct. 2020 06h50 HE | Unigold Inc.
LP20-162 intersected 14.0 meters averaging 14.94 g/t Au, 51.6 g/t Ag, 0.3% Cu, 3.6% Zn and a second interval of 6.0 meters averaging 10.30 g/t Au, 5.0 g/t Ag, 0.3% Cu and 1.7% Zn;The mineralization is...
Figure 1.0
Unigold Intersects 8.0 Meters Averaging 16.48 g/t Au at Target C, Candelones Extension Deposit
14 oct. 2020 06h55 HE | Unigold Inc.
LP20-160 intersected 8.0 meters averaging 16.48 g/t Au, 57.7 g/t Ag, 0.3% Cu and 0.8% Zn;Consistent mineralization shows most assays between 5 g/t and 42 g/t AuNewest intersection is only 125 meters...
UGD LOGO.png
Unigold Files Technical Report on Candelones Project
09 oct. 2020 17h05 HE | Unigold Inc.
TORONTO, Oct. 09, 2020 (GLOBE NEWSWIRE) -- Unigold Inc. (“Unigold” or the “Company”) (TSX-V:UGD, OTCQX:UGDIF, UGD1:FSE) is pleased to report that the Technical Report titled “Updated Mineral...