Hemlo Intersects 3.97 g/t Au over 1 m at the North Limb Project Lunny West Showing
30 sept. 2021 07h00 HE
|
Hemlo Explorers Inc.
TORONTO, Sept. 30, 2021 (GLOBE NEWSWIRE) -- Hemlo Explorers Inc. (the “Company”) (TSXV: HMLO) is pleased to provide an update on its drill program at the North Limb project, located 15 km north of...
Goliath Drills 21.72 Meters* of Quartz-Sulphides Veining and Brecciation 1,000 Meters Down Dip From the Northeast Showing at Surebet Zone, Golden Triangle B.C.
23 sept. 2021 08h00 HE
|
Goliath Resources Limited
All 24 completed drill holes drilled intersected significant widths of quartz-sulphides veining demonstrating the robust nature of the Surebet Polymetallic Gold-Silver Zone (“Surebet”) that remains...
Goliath Drills 35.72 Meters* Grading 6.37 g/t Gold Equivalent (4.46 g/t Au and 122.13 g/t Ag) at Surebet High-Grade Gold-Silver Discovery, Golden Triangle B.C.
30 août 2021 02h00 HE
|
Goliath Resources Limited
Assay results from the third hole (GD21-003) intercepted Surebet Zone’s polymetallic quartz-sulphide vein system demonstrate an impressive 35.72 meters* of quartz-sulphide breccia and surrounding...
Hemlo Continues to Intersect Anomalous Gold Horizons at the Armand Lake Volcanic Complex
24 août 2021 07h00 HE
|
Hemlo Explorers Inc.
TORONTO, Aug. 24, 2021 (GLOBE NEWSWIRE) -- Hemlo Explorers Inc. (the “Company”) (TSXV: HMLO) is pleased to provide an update on its drill program at the North Limb project, located 15 km north of...
Goliath’s Seventh Drill Hole Intersects 48.2 Meters* of Extensive Quartz-Sulphides Veining, ~600 Meters North of Cliff Pad Surebet Zone, Golden Triangle B.C.
12 août 2021 02h00 HE
|
Goliath Resources Limited
All Seven drill holes completed to date have intersected significant widths of veining and sulphides demonstrating the robust nature of this mineralized system at the Surebet Polymetallic Gold-Silver...
Goliath Intersects 61.5 Meter* Zone Containing Quartz-Sulphides Veining at Sixth Hole ~600 Meter Step Out to the North From Cliff Pad Along Strike, Surebet Zone Golden Triangle B.C.
06 août 2021 02h00 HE
|
Goliath Resources Limited
The first drill hole from the North pad, GD21-006 (completed @ 195 meters, 060⁰/-62⁰) and intersected 61.5 meters* of quartz-sulphides (galena, pyrrhotite, sphalerite, chalcopyrite) veining,...
Goliath Drills 67.1 Meters of Quartz-Sulphide Veining, Brecciation and Associated Alteration in Fourth Drill Hole (GD21-004) at the Surebet Zone, Golden Triangle B.C.
30 juil. 2021 02h00 HE
|
Goliath Resources Limited
One hundred percent of the drill holes completed to date have intersected significant widths of veining and sulphides demonstrating the robust nature of this extensive mineralizing Polymetallic...
Hemlo Explorers Intersects a Contiguous Gold Bearing Horizon over 400 metre Strike
27 juil. 2021 07h00 HE
|
Hemlo Explorers Inc.
TORONTO, July 27, 2021 (GLOBE NEWSWIRE) -- Hemlo Explorers Inc. (the “Company”) (TSXV: HMLO) is pleased to provide an update on its drill program at the North Limb project, located 15 km north of...
Goliath Intersects 78 Meters of Quartz-Sulphide Veining, Brecciation and Associated Alteration in Third Drill Hole (Gd21-003) at the Surebet Zone, Golden Triangle B.C.
26 juil. 2021 02h00 HE
|
Goliath Resources Limited
The third drill hole, GD21-003 (165 m, 220°/-70°) intersected 78.0 meters* of quartz-sulphide veining, brecciation and associated alteration from 49.0 to 127.0 meters (link to images);The 53.5 meter*...
Amarillo drills 144.6 m of 0.7 g/t gold including 91.6 m at 0.9 g/t gold at LDS
23 juin 2021 07h52 HE
|
Amarillo Gold Corp.
TORONTO, June 23, 2021 (GLOBE NEWSWIRE) -- Amarillo Gold Corporation (TSXV: AGC, OTCQB: AGCBF), through its Brazilian affiliate, has drilled a significant gold-hosting structural zone on Lavras do...