Stack Social Media Image (Sept 2021).png
Stack Capital Group Inc. Announces Change of Independent Auditor
27 sept. 2024 16h30 HE | Stack Capital Group Inc.
Stack Capital Group Inc. today announced that it has engaged MNP LLP as its independent auditor, replacing PwC LLP, effective as of September 27, 2024.
Goliath - image 1
Goliath Intercepts 35.04 g/t AuEq (1.13 oz/t AuEq) Over 6.34 Meters ~True Width, Two Deeper Intercepts Have Assays Pending, Surebet Discovery, Golden Triangle, B.C. – System Remains Wide Open
30 juil. 2024 07h08 HE | Goliath Resources Limited
Drill Highlights: Drill hole GD-24-235 intercepted abundant visible gold and high-grade gold mineralization containing 35.04 g/t AuEq (34.16 g/t Au and 34.15 g/t Ag) over 6.34 meters ~true width,...
Infographic 1
Goliath Starts Drilling With Two Rigs Testing Surebet Feeder Source And Magnitude, Plus Three New Outcropping High-Grade Au-Cu Targets At Golddigger Property, Golden Triangle, B.C.
08 juil. 2024 07h08 HE | Goliath Resources Limited
The 2024 planned drill campaign at the Golddigger Property includes 62 holes from 22 drill pad locations with up to three diamond drill rigs for 15,000 meters.The Surebet Discovery will see the bulk...
Goliath BC - logo with gradient gold-justified.png
Goliath Amends Option Agreement To Fast Track 49% Ownership In Golddigger Property Based on Positive Results To Date, Golden Triangle B.C.
15 avr. 2024 07h08 HE | Goliath Resources Limited
TORONTO, April 15, 2024 (GLOBE NEWSWIRE) -- Goliath Resources Limited (TSX-V: GOT) (OTCQB: GOTRF) (FSE: B4IF) (the “Company” or “Goliath”) is pleased to report it has fast tracked its 49% ownership...
Goliath BC - logo with gradient gold-justified.png
Goliath Resources Limited Pre-Selected by Noble Capital Markets Inc. to Present at NobleCon20
08 avr. 2024 07h08 HE | Goliath Resources Limited
TORONTO, April 08, 2024 (GLOBE NEWSWIRE) -- Goliath Resources Limited (OTCQB: GOTRF) (TSX-V: GOT) (FSE: B4IF) (the “Company” or “Goliath”) is pleased to announce it has been pre-selected by South...
Goliath BC - logo with gradient gold-justified.png
Goliath Resources Selected for PDAC 2024 Core Shack, Session A (Sunday, March 3rd – Monday, March 4th) Booth # 3104
21 févr. 2024 07h08 HE | Goliath Resources Limited
TORONTO, Feb. 21, 2024 (GLOBE NEWSWIRE) -- Goliath Resources Limited (TSX-V: GOT) (OTCQB: GOTRF) (FSE: B4IF) (the “Company” or “Goliath”) is pleased to announce it has been selected by the PDAC 2024...
Infographic 1
Goliath Finds 101 g/t Au (3.25 oz/t) At Newly Discovered Full Contact Outcrop Within 1.4 km Gossan Trend On Golddigger’s Cambria Ice Fields, Golden Triangle, British Columbia
22 janv. 2024 07h08 HE | Goliath Resources Limited
FULL CONTACT HIGH-GRADE Au TARGET HIGHLIGHTS: The new high-grade Full Contact discovery consists of a 1.4 km trend on the “Red Line” (the contact between Stuhini and Hazelton Group rocks) within...
Infographic 1
Goliath Drills 513 Gram*Meter AuEq Hole Assaying 65 g/t AuEq Over 7.90 Meters* At Surebet In Newly Discovered High-Grade Gold Bonanza Shear Within The Golden Gate Feeder Zone, Golden Triangle, British Columbia
30 oct. 2023 06h08 HE | Goliath Resources Limited
Drill Highlights: GD-23-180 collared from Pad 16 intercepted numerous occurrences of Visible Gold, as well as strong sulphides mineralization in quartz-stockwork and veins corresponding with the...
Image 1
Goliath Drills 34.03 g/t AuEq Over 9 Meters at Newly Discovered Golden Gate Zone Proximal to the Feeder Source Within 11.60 g/t AuEq Over 27 Meters, Golddigger Property, Golden Triangle, B.C.
17 oct. 2023 06h08 HE | Goliath Resources Limited
Drill Highlights: GD-23-197 is collared from Pad 16 within the newly discovered Golden Gate Zone and hosted within the Hazelton-Volcanics 20 meters below the Bonanza Shear containing abundant visible...
Infographic 1
Goliath Completes Over 34,000 Meters of Drilling in 2023 for a Cumulative Total of Over 65,000 Meters and Successfully Expands the Mineralized Footprint of Surebet Discovery to 1.8 km²
16 oct. 2023 06h08 HE | Goliath Resources Limited
2023 HIGHLIGHTS: Goliath significantly increased this years program from 18,000 to over 34,000 meters from 124 holes, for a cumulative total of over 65,000 meters of diamond drilling from 234 holes...